Traffic

More NTMP Poll Results by Lori Bigler

 

On July 26th the NTC members received the following update on the NTMP project:

Dear NTC members,

As previously indicated, we sent out a survey to the 52 residents and subsequently received 26 responses back. 23 of the 52 support the current plan and 3 do not.  Based on the updated results, the test cushions will remain and we’ll move forward with the final Council approval and close out the project. Thank you for your patience and input throughout the project.

Thank you,

Khang Nguyen, P.E., PTOE | Assistant Director
City of Houston | Houston Public Works | Transportation & Drainage Operations

City of Houston: Traffic Meeting by Guest User

The WHCA is sharing this on behalf of the City of Houston. Any questions about the meeting, the provisions of the traffic plan, or the comment form should be directed to the Department of Public Works and Engineering. The Notice of Public Meeting will also be sent out from the City via mail to all residents affected by the proposed Neighborhood Traffic Management Plan per city ordinance. (Download the CoH Meeting Notice)

Based upon the comments received from the previous proposal, the City's engineers will be presenting their latest proposed revision of the plan during the meeting to be held on December 6, 2016 at 7pm.  The meeting will be held at Hogg Middle School's cafeteria.

Please note that a NEW comment period will follow the meeting and all residents are requested to provide new comments, as the city does not amalgamate old comments (from previous plans) into the new commenting period. Please DO NOT submit comments before the December 6 meeting.

Save the Date: Neighborhood Traffic Meeting Dec. 6th by Guest User

Mark your calendars for 7pm on Dec. 6th at Hogg Middle School for the next public hearing with city engineers regarding the most recent traffic management proposal. The City of Houston will mail you an official meeting notice so please be on the lookout for it. Be sure to check our website, Facebook page, or Nextdoor for new information on this topic as it develops.

Download the most recent traffic plan.

Major Closures Related to Houston Ave. Bridge Reconstruction by Guest User

Council Member Cisneros' office sent the following information to the WHCA regarding the upcoming closures that will facilitate the start of the partial reconstruction of the Houston Ave. Bridge near Allen Parkway. This prep work is required to facilitate the construction of the new Allen Parkway Entrance Ramp to IH 45 Southbound. 
 
These closures will be input into the TxDOT PIO system on Monday, 06.27.16.

  1. IH 45 Southbound Main lanes between the North Main Entrance Ramp and IH 10:  Alternate, (Inside), Lanes closed continuously between 9:00 PM on Friday, 07.08.16 and 5:00 AM on Monday, 07.11.16.  At least two main lanes will remain open.
  2. IH 45 Southbound Mainlanes at IH 10:  Total Closure continuously between 9:00 PM on Friday, 07.08.16 and 5:00 AM on Monday, 07.11.16.  Detour: IH 10 Eastbound to US 59 Southbound; Follow US 59 Southbound to IH 45.
  3. IH 10 Westbound Exit to IH 45 Southbound:    Total Closure continuously between 8:30 PM on Friday, 07.08.16 and 5:00 AM on Monday, 07.11.16.  Detour: IH 10 Westbound to the Taylor Exit; Left, (South) on Taylor; Left, (East) onto the IH 10 Eastbound Entrance Ramp.  Follow the IH 10 Eastbound Mainlanes to the exit to IH 45 Southbound.
  4. IH 10 Eastbound Exit to IH 45 Southbound:    Total Closure continuously between 8:30 PM on Friday, 07.08.16 and 5:00 AM on Monday, 07.11.16.  Detour: IH 10 Eastbound to US 59 Southbound; Follow US 59 Southbound to IH 45.
  5. IH 45 Southbound Mainlanes between IH 10 (Dart St.) and Walker:  1 Right, (Outside), Lane closed continuously between 5:00 AM on Monday, 07.11.16 and 5:00 AM on Wednesday, 09.07.16.
  6. IH 45 Southbound Exit to Dallas St./Pierce St.: Total Closure Continuously between 9:00 PM on Friday, 07.08.16 and 5:00 AM on Wednesday, 09.07.16.  Detour Southbound on IH 45 to the IH 45 Southbound Exit to McKinney; Right, (West) on Smith, Left on Pierce St.
  7. Allen Parkway Eastbound Entrance Ramp to IH 45 Southbound:  Total Closure Continuously between 5:00 AM on Tuesday, 07.05.16 and 5:00 AM on Monday, 11.14.16.  Detour: Eastbound on Allen Parkway/Dallas; Right, (West) on Smith, Left, (East) on Jefferson; Follow Jefferson to the IH 45 Southbound Entrance Ramp.
  8. Houston Ave. Southbound between Washington Ave. and Rusk:  1 Alternate Lane closed continuously between 7:30 PM on Friday, 07.08.16 and 5:00 AM on Wednesday, 09.07.16.
  9. Houston Ave. Southbound at Lubbock and at Rusk:  Total Closure Continuously between 7:30 PM on Friday, 07.08.16 and 5:00 AM on Wednesday, 09.07.16.   Detour:  Right, (Eastbound) on Rusk; Right, (South) on Smith; Left, (East) on Jefferson; Follow Jefferson to the IH 45 Southbound Entrance Ramp.

Phil Teague, WHCA VP of Infrastructure, will coordinate with TXDoT to ensure that the IH 10 Watson west or eastbound exit is shut off when it needs to be to inhibit redirect traffic from the freeway closures.

Recent Traffic Problems by Guest User

Last week, the neighborhood experienced a significant traffic spike as a result of TxDOT’s closure of I-10 to do construction on the Houston Avenue Bridge. This included several 18-wheelers streaming up Watson, despite the sign at Usener and Watson that clearly prohibits such traffic. The WHCA is working with State and City officials, including the Mayor’s office, to make sure that they have a plan in place to make sure history doesn’t repeat itself the next time I-10 or I-45 is shut down. But this is also a reminder of the importance to implement traffic calming measures in the neighborhood. If you would like to join the neighborhood committee that is working with the City on this issue, please email us at infrastructure@woodland-heights.org